Limit Down Time With a Field Fit Pre-Plan

Are you waiting for new equipment to arrive on-site only to find final connections need design adjustments? This may be causing longer than necessary shutdown times and negatively affecting your overall project schedule.

Borton-Lawson utilizes the latest 3D technologies in the post-fabrication, pre-installation stage to help prepare a field fit pre-plan. From a fully immersive model, clash detection can be run between as-designed and as-fabricated elements to minimize any installation complications.

These solutions allow for design adjustment prior to delivery and help ensure your schedule timeframes are met.