Project Experience
Plant Exhaust Emissions Abatement
A manufacturer in the minerals industry entered into a consent decree with the United States Environmental Protection Agency to reduce exhaust emissions for multiple plants across the country. Borton-Lawson provided engineering design and permitting services to prepare the sites for the abatement equipment and interface with the plant. These services included grading and drainage, utility infrastructure, foundations, secondary containment, compressed air systems, normal and backup power with emergency generators, and utility bridges.