Feedwater Heater

These solutions allow for design adjustment prior to delivery and help ensure your schedule timeframes are met.

Challenges V. Solutions

Challenge:Feedwater heaters were being shipped to a client site but the manufacturing tolerances were creating field fit delays which was causing longer than necessary shutdown times and negatively affecting both schedule and budget.

Solution Borton-Lawson utilized the latest 3D technologies in the post-fabrication, pre-installation stage to help prepare a field fit Pre-plan. A 3D model of the design was created and from that fully immersive model, clash detection was analyzed between as-designed and as-fabricated elements to minimize any installation complications.