Walnut Creek Stormwater Outfall and Pump Station

Borton-Lawson teamed with Foth to provide a comprehensive solution for the City of West Des Moines. The mitigation solutions include construction of a new 12’ by 5’ reinforced concrete box culvert to intercept and convey interior stormwater flows, and a new 200,000 gallons per minute (gpm) stormwater pump station to discharge runoff to Walnut Creek during elevated flood stages. The stormwater pump station is proposed to be situated along Walnut Creek in an existing U.S. Army Corps of Engineers flood control project – the Des Moines, Iowa levee system. As a result, a U.S. Army Corps of Engineers Section 408 Permit was required for the modifications to the levee.